Sylvain Boissy
Production manager, Imerys / Damrec
I have started my carreer in Xinjiang (China) with Imerys as production engineer in 2008. We completly have changed the process during 2009.
I am currently production manager of this beautiful new plant. I have to train the local people and to keep secret in the same time the key of the production.
We are putting in place new procedure (to control the process) and keeping improving the process in order to push the plant to the maximum capacity before october 2011.
77 contacts
2008 - 2010Construction of a new plant in China (Xinjiang).
Andalusite plant :
-3*60t/h HMS, DMS plant (designed by Bateman (South africa))
-Magnetic separation (Eriez)